Digital Whiteboards for R&D Sprints: Keep One Vibe Canvas Across Weeks
Choose Vibe Board S1 with a signed-in Vibe Canvas workspace when your R&D team wants to continue the same visual project across weekly sprints. Keep one project canvas as the working record. Add the next sprint's decisions to that record, and use a PDF only when you need a reading copy.
- Use the named project owner's account for the project canvas.
- Return to the same working canvas at the next review.
- Identify the project link in the sprint agenda.

Choose a persistent, expandable working canvas
For R&D, choose around continuity and room participation together. A saved canvas is useful only if the team can return to the same project and keep extending the visual discussion. Avoid scattering each sprint's decisions into disconnected meeting files.
Consult the product overview.
Work together on an infinite canvas from any device – Vibe Board, web browser, tablet, or smartphone.
For a dependency map or evolving architecture diagram, organize successive sprint discussions around the same project rather than separate presentation slides.
The Vibe Canvas guide identifies the account and return points:
| Canvas detail | Published instruction or behavior |
|---|---|
| Account saving | Signed-in users Canvas sessions are saved to their Vibe account. |
| Canvas mode | Tap Whiteboard to open an infinite Canvas file. |
Choose a named project owner and individual collaborator invitations with the board. The main limitation is that the hardware purchase does not migrate an existing workspace; plan that separately. A hardware purchase and the team’s choice of working project are separate decisions.
Keep the project link in the sprint agenda. At the next meeting, open that project rather than starting a replacement canvas with a similar name.
Compare realistic room configurations
| Arrangement | Use it for | Decide before the next sprint |
|---|---|---|
| Vibe Board S1 with the team's Vibe Canvas project | Continuing the shared visual discussion | Account ownership and the working project link |
| Existing computer with the team's chosen shared-canvas software | Evaluating a software-first arrangement | How the room will view and contribute to that workspace |
| Existing touch display connected to the team’s computer | Retaining an established computer-based canvas workflow | Connection, touch control and the software account used by the room |
For an R&D team, prioritize the first arrangement when the room needs a dedicated board for the continuing project discussion. Evaluate the computer arrangement if the team already has an established workspace. For an existing touch display, assess the complete computer-and-software arrangement rather than comparing screen size alone. Keep the familiar workspace and the proposed room arrangement on the same evaluation agenda.
Consider a software-design team tracing a service dependency across successive sprints. Preserve the original diagram, add the newly agreed dependency and label the unresolved decision. Keep the discussion beside the affected portion of the drawing. Create a separate area for the next sprint while leaving the earlier reasoning visible. Use separate labels for proposals and decisions.
Keep the expanding project readable
As the diagram grows, separate active discussion from settled decisions. Keep an agreed review copy at meaningful milestones. Split a project when unrelated work makes the shared map hard to follow; continuing one canvas is an organizational choice, not a requirement.
Choose a named project owner and invite collaborators individually. Avoid sharing a single login.
Consult the save-and-share guide.
Enter the email address and select the access level you wish to grant to the individuals you want to share the canvas with.
Use the presentation and sharing instructions when configuring the session. Recheck the audience before sharing a project with outside consultants or clients.
Match the S1 hardware to the actual room
For hardware parameters, consult the technical specification chart:
| Product | Parameter | Published specification |
|---|---|---|
| Vibe Board S1 55'' | Display size | Diagonal Screen Size 55" |
| Vibe Board S1 55'' | Display resolution | Optimum Resolution 3840 (H) x 2160 (V) @ 60Hz |
| Vibe Board S1 55'' | Memory | RAM (Arm) 8GB DDR4 |
| Vibe Board S1 55'' | Processor | CPU (Arm) Arm RK3588 |
| Vibe Board S1 55'' | Storage | Storage (Arm) 128GB EMMC |
Bring a representative dependency diagram or wireframe to the room evaluation. Read its small labels from the expected seats. Ask participants to add a change to the actual project. Evaluate the intended workload directly instead of inferring canvas capacity or stylus latency from memory and display figures.
For workspace context, see Vibe's Canvas update overview.
FAQ
Which setup should an R&D team shortlist for weekly design sprints?
Shortlist Vibe Board S1 with the team's signed-in Vibe Canvas workspace. Evaluate it using the actual project and the accounts that will continue the work.
Should we create a new canvas every week?
Keep one working project when continuity is the goal. Use sprint labels to make the continuing discussion readable.
How should we organize a canvas across successive sprints?
Keep one project with clearly labeled working areas. Place new discussion beside the affected part of the diagram and retain earlier reasoning for reference.
What should we send after a review?
Send the agreed reference copy and identify the working project separately. Identify the intended audience in the follow-up message.